ANALISA REKAYASA NILAI PEKERJAAN STRUKTUR GEDUNG TEKNIK INFORMATIKA U P N “VETERAN” JATIM

Anna, Rumintang (2008) ANALISA REKAYASA NILAI PEKERJAAN STRUKTUR GEDUNG TEKNIK INFORMATIKA U P N “VETERAN” JATIM. Jurnal Rekayasa Perencanaan. ISSN 1829-913X

[img]
Preview
PDF - Published Version
Download (82Kb) | Preview

    Abstract

    One of analysis methode that is use to evaluate construction project management in order to minimize cost, work optimation & time efectivity with also care about the project quality is by using value engineering. The main reason to use this Analysis methode is the systematic and procedural approach in the object evaluation. Stages on the job plan are information stage, creative, analysis & recommendation stages which is the first one is the specify the item with highest cost, then the analyse stage to choose the alternative for the life cycle cost compare & to classifiet the main & seconding functional to get cost/wort ratio. Is the result of this engineering analysis is cost minim for example on the foundation work has cost minimizing until Rp.125.855.576,30.On the concrete slab work has cost minimizing until Rp. 78.988.937,72. On the nain bean work has cost minimizing until Rp.24.308.712,38. On stain work has cost minimizing until Rp. 1.337.750,45. On coloum work has cost minimizing until Rp.5.210.435,70.So totally it has cost minimizing until Rp. 235.701.412,5. Key word : Value Engineering Job Plan, Life Cycle Cost, Cost/Worth

    Item Type: Article
    Subjects: T Technology > T Technology (General)
    Divisions: UPN Jatim Journal > Jurnal Rekayasa Perencanaan
    Depositing User: Fatchullah Z.A
    Date Deposited: 25 Apr 2011 13:50
    Last Modified: 25 Apr 2011 14:38
    URI: http://eprints.upnjatim.ac.id/id/eprint/1313

    Actions (login required)

    View Item