ANALISIS PERENCANAAN WAKTU KAPASITAS PRODUKSI MENGGUNAKAN METODE RCCP (ROUGHT CUT CAPACITY PLANNING) DI PT. LASER JAYA SAKTI GEMPOL - PASURUAN

Anugerah Yudha, Prasetya (2011) ANALISIS PERENCANAAN WAKTU KAPASITAS PRODUKSI MENGGUNAKAN METODE RCCP (ROUGHT CUT CAPACITY PLANNING) DI PT. LASER JAYA SAKTI GEMPOL - PASURUAN. Undergraduate thesis, Faculty of Industrial technology.

[img]
Preview
PDF - Published Version
Download (1014Kb) | Preview
    [img] PDF - Published Version
    Restricted to Repository staff only

    Download (4Mb)

      Abstract

      Today an industrial company that produces a product must have a good strategy in meeting the needs of consumers. Capacity is the sum of the maximum output that can be generated by a facility within a certain time period and is expressed in the number of output per unit time. In meeting the needs of the product by consumers, companies need to pay attention to capacity planning and controlling production activities to do in fulfillment of orders in the market. PT.Laser Jaya Sakti is a company engaged in manufacturing. Ducting product that is produced by PT.Laser Jaya Sakti is ducting (ducting flat Type 300 x 250 mm "). PT. Laser Jaya Sakti, in fact, production planning, but its implementation is only based on the sales of the previous period, thus enabling the production time that is not optimal and requires additional production time (hours overtime).So the constraints in face is whether the capacity of the production time was able to meet consumer demand. To anticipate these problems applied method Rought Cut Capacity Planning (RCCP). Rought Cut Capacity Planning is "analysis to test the availability of capacity of production facilities that are available in the meeting master production scheduling (Master Production Schedule) which has been established" with Engineering Bill Of Labor (BOL). Of the six work stations in PT.Laser Jaya Sakti there are two stations that do not meet the production capacity so that the need to conduct additional work hours (overtime) or shift work on every month that is in the process of work stations Sizing / Labelling with additional hours of overtime for the month of October 2010 until April 2011 in succession at 335,71 hours/month, 475,99 hours/month, 475,99 hours/month, 475,99 hours/month, 475,99 hours/month, 475,99 hours/month, and the process needs to be held additional Sift Welding work for October 2010 until April 2011 in succession at 291,07 hours/month, 570,82 hours/month, 570,82 hours/month, 570,82 hours/month, 570,82 hours/month, 570,82 hours/month, 570,82 hours/month and 570,82 hours/month.

      Item Type: Thesis (Undergraduate)
      Subjects: T Technology > TS Manufactures > TS155 Production management. Operations management
      Divisions: UNSPECIFIED
      Depositing User: Fatchullah Z.A
      Date Deposited: 25 Oct 2011 08:35
      Last Modified: 25 Oct 2011 08:36
      URI: http://eprints.upnjatim.ac.id/id/eprint/1825

      Actions (login required)

      View Item