PERENCANAAN KAPASITAS WAKTU PRODUKSI DENGAN METODE ROUGHT CUT CAPACITY PLANNING ( RCCP ) DI PT. PETROKIMA GRESIK

Mursyid, - (2011) PERENCANAAN KAPASITAS WAKTU PRODUKSI DENGAN METODE ROUGHT CUT CAPACITY PLANNING ( RCCP ) DI PT. PETROKIMA GRESIK. Undergraduate thesis, Faculty of Industrial Technology.

[img]
Preview
PDF (Hal. depan - Bab I)
Download (1046Kb) | Preview
    [img] PDF (Bab II - Daftar pustaka)
    Restricted to Repository staff only

    Download (4Mb)

      Abstract

      In entering free Era market a period of/to is all these of company which active in industry expected at one particular problem of that is existence of emulation storey;level which is kompetitif. This matter oblige company to plan capacities produce so that/ to be can fulfill request of market punctually and with appropriate amount, is so that expected by advantage of company will mount.. In accomplishment of requirement of product will by consumer, company require to pay attention Planning of capacities and operation of production activity which must be conducted in accomplishment of order in market. PT. PETROCHEMICAL [of] Gresik is peripatetic company in fertilizer industry., manure yielded by PT. PETROCHEMICAL of Gresik is manure of ZA,NPK,UREA,PHONSKA. PT.PETROKIMIA Gresik alone specially in part of ZA, sometimes experience of difference of result produce with forecasting of previous data, which result its production process is desisted causing addition of overtime hour/clock or contract sub energy, as well as having an in with to the number of request of consumer and also accomplishment of manure subsidize to government,. Hence constraint which [in] facing is do time capacities produce have earned to fulfill request of consumer. Rought Cut Capacity Planning represent " analysis to test the availibility of available production facility capacities in fulfilling production mains schedule ( Master of Production Schedule) which have been specified" with Technique of Bill Of Labor ( BOL). From result of research, From four station work in Pt. Petrokimia-Gresik there are 2 station work still experience of lacking of capacities produce that is at job station Process Reaction and of Kristalisasi with detail of January month;moon equal to 6197.76 Hour / month;moon, for the month;moon of Feb up to December 2011 successively equal to 6495.64 Hour / month;moon for the Process of To packing with detail of January month;moon equal to 7437.84 Hour / month;moon, for the month;moon of Feb up to December 2011 successively equal to 7521.06 Hour/ month;moon. So that need the existence of addition of labour and machine in job station process and reaction of kristalisasi process and packing of product.

      Item Type: Thesis (Undergraduate)
      Subjects: T Technology > T Technology (General) > T55.4 Industrial engineering. Management engineering
      Divisions: Faculty of Industrial Technology > Industrial Engineering
      Depositing User: Users 2 not found.
      Date Deposited: 07 Nov 2011 13:46
      Last Modified: 07 Nov 2011 13:46
      URI: http://eprints.upnjatim.ac.id/id/eprint/2040

      Actions (login required)

      View Item