PENENTUAN JUMLAH KARYAWAN DI LINE PROSES PRODUKSI DENGAN METODE WORK LOAD ANALYSIS (WLA) DI PT. KUSUMA DIPA NUGRAHA MOJOKERTO

Decky Satrya , Pamungkas (2012) PENENTUAN JUMLAH KARYAWAN DI LINE PROSES PRODUKSI DENGAN METODE WORK LOAD ANALYSIS (WLA) DI PT. KUSUMA DIPA NUGRAHA MOJOKERTO. Undergraduate thesis, Faculty of Industrial Engineering.

[img]
Preview
PDF (Cover - Bab I)
Download (60Kb) | Preview
    [img] PDF (Bab II - Daftar Pustaka)
    Restricted to Repository staff only

    Download (657Kb)

      Abstract

      Methods Work Load Analysis (WLA) is descriptive of the workload needed in an enterprise unit. This method will provide information on the allocation of employee resources to complete the workload. With diterapkanya Work Load Analysis method is expected to increase work efficiency of employees in general so that it can fulfill the desires of consumers, and ultimately corporate objectives will be achieved. PT. Kusuma Nugraha Dipa is a company engaged in manufacturing Organic fertilizers are located in the village of Mojorejo district. Pungging - Mojokerto. fertilizers is produced in the form of organic fertilizer Granule. With raw material impurities animals, compost, filter cake (sugar factory waste), sewage fungus, tobacco waste and fillers. In the line of organic fertilizer production process are employees some 31 people. Observations glance shows that the workload at each station work has not been evenly distributed, it is characterized by the presence of idle time employees Another employee who was doing his job. Employees with excessive workload will tend to get bored quickly and tired in carrying out their duties, so tend not productive. productive productive or not an employee depends on the work load, for that party companies must pay attention to the workload that will be given to employees to achieve optimum employee productivity. Based on the results of measurements of the workload on the PT. X by using Work Load Analysis method (WLA) concluded that employee workload Visual section 98.49% with the optimal number of employees is 19 people, the Packer section 89.12% with the optimal number of employees is 9 people, the Operators section 97.63% with the optimal number of employees is 4.

      Item Type: Thesis (Undergraduate)
      Subjects: T Technology > TS Manufactures > TS155 Production management. Operations management
      Divisions: Faculty of Industrial Technology > Industrial Engineering
      Depositing User: Users 2 not found.
      Date Deposited: 20 Sep 2012 08:45
      Last Modified: 20 Sep 2012 08:45
      URI: http://eprints.upnjatim.ac.id/id/eprint/3790

      Actions (login required)

      View Item