PERENCANAAN KAPASITAS WAKTU PRODUKSI RODA GEARHOIS DENGAN METODE CAPACITY REQUIREMENT PLANNING ( CRP ) DI CV. RAMA TEKNIK SURABAYA

FARID , ZULKARNAEN (2012) PERENCANAAN KAPASITAS WAKTU PRODUKSI RODA GEARHOIS DENGAN METODE CAPACITY REQUIREMENT PLANNING ( CRP ) DI CV. RAMA TEKNIK SURABAYA. Undergraduate thesis, Faculty of Industrial Engineering.

[img]
Preview
PDF (Cover - Bab I)
Download (73Kb) | Preview
    [img] PDF (Bab II - Daftar Pustaka)
    Restricted to Repository staff only

    Download (411Kb)

      Abstract

      In the production process a company is demanded to supply the product on time, anywhere, and amount order. If the Planning-needs of process time capacity is not optimum, then it will disturb the production-scheduled and caused loss profit for the time and process session. So, it will be needed a planning method to the time capacity for a good production that suitable for the maximum output to fulfill market-demand. CV. Rama Teknik is one of the companies that go to the spareparts which produces Roda Gearhois. A problem that faced to the company is the lateness of the production process to the Roda Gearhois product, until it disturbs the scheduled of making the product and it caused loss-profit, by affecting the time and process side. This thing really affects the way of CV. Rama Teknik to improve its production, and the filling of the consumer needs is disturbed. The way this problem exists makes this research uses Capacity Requirement Planning (CRP), with a hope CV. Rama Teknik can handle the planning and the process to suit the level of the request is suitable with the time capacity that available by identifying the center of the working area which is over and below capacity that available, so it makes the processing of the product can be faster. For the counting of the lacking to the time capacity on January 2011- December 2011, it an be known that by using company method valuing to the sum of lacking to the time capacity up to 476,1 hours, and by using CRP method valuing to the sum of lacking to the time capacity up to 230,2 hour, so the CRP method is better than company’s method, Because of lacking to the time capacity that produces a little than company’s method. In filling the request in January 2012 – December 2012 by using work-hours 8 hour/shift, proved the company still in the loss-profit stages in the time capacity up to 110,5 hour, to fix this up, so it will be given the idea to an addition of work-hour it makes the lacking of time capacity solved.

      Item Type: Thesis (Undergraduate)
      Subjects: T Technology > TS Manufactures > TS155 Production management. Operations management
      Divisions: Faculty of Industrial Technology > Industrial Engineering
      Depositing User: Users 2 not found.
      Date Deposited: 15 Oct 2012 09:08
      Last Modified: 15 Oct 2012 09:09
      URI: http://eprints.upnjatim.ac.id/id/eprint/3910

      Actions (login required)

      View Item