Pengukuran Kinerja Supply Chain Dengan Metode Scor Di Kesatuan Bisnis Mandiri Industri Kayu (KBM IK) Cepu

Septian, Nugroho (2018) Pengukuran Kinerja Supply Chain Dengan Metode Scor Di Kesatuan Bisnis Mandiri Industri Kayu (KBM IK) Cepu. Undergraduate thesis, UPN "Veteran" Jatim.

[img]
Preview
PDF (Cover) - Published Version
Download (410Kb) | Preview
    [img]
    Preview
    PDF (Abstrak) - Published Version
    Download (94Kb) | Preview
      [img]
      Preview
      PDF (Bab 1) - Published Version
      Download (98Kb) | Preview
        [img] PDF (Bab 2) - Published Version
        Restricted to Repository staff only

        Download (416Kb)
          [img] PDF (Bab 3) - Published Version
          Restricted to Repository staff only

          Download (129Kb)
            [img] PDF (Bab 4) - Published Version
            Restricted to Repository staff only

            Download (277Kb)
              [img]
              Preview
              PDF (Bab 5) - Published Version
              Download (87Kb) | Preview
                [img]
                Preview
                PDF (Daftar Pustaka) - Published Version
                Download (95Kb) | Preview
                  [img] PDF - Published Version
                  Restricted to Repository staff only

                  Download (782Kb)

                    Abstract

                    KBMIK Cepu is located in Batokan vilage, Bojonegoro and is a private company in indonesia engaged in manufacturing, which produces shaft gear products that use customer order production system, or better known as continue company. Therefore, companies must always maintain the performance of the supply chain so that the product did not experience delays in production. With this research is expected to increase in performance in the company's Supply Chain Management. From the results of the performance of the Supply Chain performance KBMIK Cepu can be seen that the highest performance value contained in the period in november 2017 amounted to (614,45) and the performance of the lowest Supply Chain contained in april 2017 period amounted to (446,58). And of the 11 performance indicators Supply chain company there are 6 indicators that have value high score and 5 indicators that have a value lower scores, the first is the Number of customer complaint with a score of (22.6), the second is the Time to solve a complaint with a score of (22,6). The third is the Percentage of adjusted production quantitywith a score of (30), the fourth is the Forecast Accuracywith a score (31,43), and the fifth is the Supplier Delivery Lead Timewith a score (37,75). Keywords: Performance Measurement, Supply Chain, SCOR

                    Item Type: Thesis (Undergraduate)
                    Subjects: H Social Sciences > HD Industries. Land use. Labor > HD38.5 Supply Chain Management
                    Divisions: Faculty of Engineering > Industrial Engineering
                    Depositing User: Fatchullah ZA
                    Date Deposited: 03 Feb 2020 15:53
                    Last Modified: 03 Feb 2020 15:59
                    URI: http://eprints.upnjatim.ac.id/id/eprint/8149

                    Actions (login required)

                    View Item