PERANCANGAN TATA LETAK FASILITAS PABRIK PADA RUMAH POTONG HEWAN DENGAN MENGGUNAKAN METODE KUANTITATIF (FROM TO CHART) (STUDI KASUS DI PT. ABATTOIR SURYA JAYA BENOWO, SURABAYA)

YUNIAR , TRIARDITYA PUTRA SETIAWAN (2013) PERANCANGAN TATA LETAK FASILITAS PABRIK PADA RUMAH POTONG HEWAN DENGAN MENGGUNAKAN METODE KUANTITATIF (FROM TO CHART) (STUDI KASUS DI PT. ABATTOIR SURYA JAYA BENOWO, SURABAYA). Undergraduate thesis, UPN "VETERAN" JAWA TIMUR.

[img]
Preview
PDF (cover - bab 1) - Published Version
Download (845Kb) | Preview
    [img] PDF (bab 2 - daftar pustaka) - Published Version
    Restricted to Repository staff only

    Download (50Kb)

      Abstract

      Layout of production facility is a problem which often be found in industrialized worlds. Production facility layout played an important role in the efficiency of the production process and material handling process in the industrial facility. PT. Abattoir Surya Jaya is an industry that provides meat. The application of inappropriate layouts can reduce productivity and quality of the product because fatigue and long production process. It can be proved with the appearance of backtracking factor in stimulation room, chilling room, bonning room,blast freezer,and packaging. Production process should according to statutes which is line flow. From to chart sometimes called trip frequency chart or travel chart is one convensional technique which commond used for material handling and factory layout planning in one production process. Basically from to chart is an adaptation from mileage chart which commond founded in a road map, the numbers which is in from to chart would show total of load weight that should be moved and the distance of material handling. Using FTC (From To Chart) method, production units in PT. Abattoir Surya Jaya, can save distance 18,5 m from the initial conditions, and backtracking factor can be minimize from initial condition, proven by backward in moment analize showed 0 . Production lasting optimal because production room have been arranged according to production operational standard ( Line Flow). Keywords : backtracking, FTC (From To Chart), line flow

      Item Type: Thesis (Undergraduate)
      Subjects: T Technology > T Technology (General) > T55.4 Industrial engineering. Management engineering
      Divisions: Faculty of Industrial Technology > Industrial Engineering
      Depositing User: Fitri Yulianto
      Date Deposited: 14 May 2014 11:14
      Last Modified: 14 May 2014 11:15
      URI: http://eprints.upnjatim.ac.id/id/eprint/5972

      Actions (login required)

      View Item