ANALISIS PENJADWALAN PRODUKSI DENGAN METODE CAMPBELL DUDECK SMITH, PALMER DAN DANNENBRING UNTUK MEMINIMUMKAN MAKESPAN DI PT. MADJU WARNA STEEL SURABAYA

PRIM , PRASASTI (2013) ANALISIS PENJADWALAN PRODUKSI DENGAN METODE CAMPBELL DUDECK SMITH, PALMER DAN DANNENBRING UNTUK MEMINIMUMKAN MAKESPAN DI PT. MADJU WARNA STEEL SURABAYA. Undergraduate thesis, UPN "VETERAN" JAWA TIMUR.

[img]
Preview
PDF (cover - bab 1) - Published Version
Download (286Kb) | Preview
    [img] PDF (bab 2 - daftar pustaka) - Published Version
    Restricted to Repository staff only

    Download (1520Kb)

      Abstract

      In a production activity, to obtain optimum results, all activities should be planned first production well. Production scheduling strived to get an effective job assignment at each work station, in order to avoid the buildup of jobs in order to reduce idle time or waiting time for the next working processes. PT. Madju Color Steel is a manufacturing company engaged in the metal casting industry. One of the products that are produced in mining rock breaker with type Jaw Plate, Body Swing Jaw, Tougle Block, Tougle Plate, Seat Belt. The company's production activities by reservation (job order), the scheduling system FCFS (First Come First Served) the job is first come first served. In meeting the demand of consumers is less efficient because there are still some jobs that can not be completed within the customer wants. It is caused due to a less effective production activities, thereby reducing customer satisfaction and confidence. Based on the company's problems, can be seen in the delivery of the product to the consumer is still experiencing some delays there should be an optimal production scheduling alternatives. There are several methods that can be used is Dudeck Campbell Smith, Palmer, and Dannenbring. These methods can be used to plan production scheduling to minimize makespan on PT. Madju Color Steel. This method is applied in order to obtain alternative production scheduling to minimize makespan. Based on the research that has been done, it can be concluded that the optimal schedule or minimum makespan results with the method of Campbell is Dudeck Smith (CDS) and the sequence of construction job Dannenbring J5 - J1 - J3 - J4 - J2 ie Seat Belt, Jaw Plate, Tougle Block , Tougle Plate, Body Swing Jaw with makespan at 96.7195 hours, because makespannya smaller than the real condition of the company is 109.1255 days, resulting in savings of makespan by 11.4% from its original state. Keywords: Production Scheduling, Minimize makespan, Dudeck Campbell Smith (CDS)

      Item Type: Thesis (Undergraduate)
      Subjects: T Technology > T Technology (General) > T55.4 Industrial engineering. Management engineering
      Divisions: Faculty of Industrial Technology > Industrial Engineering
      Depositing User: Fitri Yulianto
      Date Deposited: 20 May 2014 08:55
      Last Modified: 20 May 2014 08:56
      URI: http://eprints.upnjatim.ac.id/id/eprint/6002

      Actions (login required)

      View Item