Items where Author is "TOMMY , BUDIAWAN"

Up a level
Export as [feed] RSS 2.0 [feed] RSS 1.0 [feed] Atom
Group by: Item Type | No Grouping
Number of items: 1.

TOMMY , BUDIAWAN (2011) PERENCANAAN KAPASITAS WAKTU PRODUKSI IMPELLER DENGAN METODE CAPACITY REQUIREMENT PLANNING (CRP) DI PT. AGRINDO - GRESIK. Undergraduate thesis, Faculty of Industrial Technology.

This list was generated on Wed Dec 25 13:30:26 2024 WIT.